Evidence Guide: RIIOGD401E - Rig up, conduct pre-spud operations and rig down

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGD401E - Rig up, conduct pre-spud operations and rig down

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to rig up, conduct pre-spud operations and rig down

  1. Obtain, interpret and confirm work requirements
  2. Access, interpret and apply documentation required to rig up, conduct pre-spud operations and rig down and confirm work activity is compliant
  3. Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
  4. Select and wear personal protective equipment required for work activities
  5. Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received
  6. Carry out pre rig-up procedure inspections within scope of own role
  7. Coordinate movement of load and sequence of installation and location
  8. Check equipment for damage and loss by moving contractor and report and BI
  9. Receive and action rig manager authorisation to commence rig-up to spud operations
  10. Receive detailed verbal and written instructions on use and type of mud from the operator and distribute
  11. Identify potential rig-up problems and take corrective action as required
  12. Keep rig manager informed of operations
Obtain, interpret and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access, interpret and apply documentation required to rig up, conduct pre-spud operations and rig down and confirm work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment required for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre rig-up procedure inspections within scope of own role

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate movement of load and sequence of installation and location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment for damage and loss by moving contractor and report and BI

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive and action rig manager authorisation to commence rig-up to spud operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive detailed verbal and written instructions on use and type of mud from the operator and distribute

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential rig-up problems and take corrective action as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Keep rig manager informed of operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for drilling of surface hole/subsea hole

  1. Check drilling and hoist equipment, report any damage to rig manager and record
  2. Conduct equipment checks for nippling-up or cross-checked with relevant procedures
  3. Check handling equipment for correct sizing and confirm fit for purpose
  4. Confirm availability of and inspect, clean, calibrate and record tubulars according to manufacturer specifications
  5. Check well control equipment according to manufacturer specifications
  6. Identify special tool requirements and check if fit for purpose and approved for use
Check drilling and hoist equipment, report any damage to rig manager and record

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment checks for nippling-up or cross-checked with relevant procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check handling equipment for correct sizing and confirm fit for purpose

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of and inspect, clean, calibrate and record tubulars according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check well control equipment according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify special tool requirements and check if fit for purpose and approved for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for pre-spud operations

  1. Lock rod racks with drill rod and position drill collars
  2. Inspect casing running tools for safety and fitness-for-purpose and rectify and report faults and malfunctions as required
  3. Record casing tallies and report
Lock rod racks with drill rod and position drill collars

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect casing running tools for safety and fitness-for-purpose and rectify and report faults and malfunctions as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record casing tallies and report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct operations as per drilling program

  1. Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program
  2. Check mud cleaning equipment and screens for integrity and correct operation according to workplace procedures
  3. Check drilling fluid quantities with sufficient being in reserve to kill well and keep hole on full trip
  4. Record mud properties on tour report
  5. Operate all equipment according to manufacturer specifications and company procedures
  6. Maintain a sound working relationship with third party contractors
Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check mud cleaning equipment and screens for integrity and correct operation according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check drilling fluid quantities with sufficient being in reserve to kill well and keep hole on full trip

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record mud properties on tour report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate all equipment according to manufacturer specifications and company procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a sound working relationship with third party contractors

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

The candidate must demonstrate the ability to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including evidence of the ability to:

rig-up, conduct pre-spud operations and rig down on at least two occasions, including:

identifying potential rig-up problems

checking drilling and hoist equipment

determining optimum circulating and penetration rates and checking deviations

receiving and actioning authorisation to commence drilling

identifying potential rig-down operations

carrying out supervision of rig up, pre-spud and rig down operations that meets required outcomes.

During the above, the candidate must:

locate and apply required documentation, policies and procedures

implement the requirements, procedures and techniques to rig up, conduct pre-spud operations and rig down, including:

identifying, addressing and reporting potential hazards and risks

checking equipment for damage and loss by the moving contractor and reporting as required

preventing usage of damaged equipment as required

identifying, addressing and reporting environmental issues

work with others to plan, prepare and conduct rig up, pre-spud and rig down operations to meet required outcomes, including:

resolving coordination requirements with others at the site prior to commencing and during work activities

carrying out pre rig-up procedure inspections within scope of own role

coordinating movement of load and sequence of installation and location according to rig movement plan

preparing for and organising work activities to meet task requirements

communicating with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones.

The candidate must be able to demonstrate knowledge to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including knowledge of:

key legislation required for rigging up, conducting pre-spud operations and rigging down

key policies, procedures and established requirements for rigging up, conducting pre-spud operations and rigging down, including those for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage and erecting barriers

work health and safety

selecting all plant, tools and equipment to carry out tasks and checking for faults

carrying out work to specifications

communication techniques relevant to work activities

troubleshoot during drilling program

carrying out calculations, including:

quantities

up-hole velocity

specific gravity

volume

hydrostatic pressures

optimum circulating and penetration rates.