The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for on-site operations
|
|
Identify the job, consult with the client and obtain relevant information, drawn from such sources as maps, drawings, specifications and codes of practice Completed |
Evidence:
|
Select equipment and materials required for the job Completed |
Evidence:
|
Identify personal protective equipment and safety procedures specified for the job and organise site induction, as required Completed |
Evidence:
|
Record description of the job to be undertaken, compare with specification and resolve any variations Completed |
Evidence:
|
Select suitable transport for site access Completed |
Evidence:
|
Brief support personnel on job requirements Completed |
Evidence:
|
Conduct on-site investigations
|
|
Identify the location of the proposed structure Completed |
Evidence:
|
Observe and record physical characteristics of the site, including topography, vegetation, recent activity and the presence of underground services Completed |
Evidence:
|
Conduct subsurface investigations, obtain samples and record strata details, including groundwater conditions, while minimising disturbance and potential contamination of site Completed |
Evidence:
|
Perform relevant in situ testing Completed |
Evidence:
|
Clean up on completion, backfilling or sealing the excavation or ensuring that it is left in a safe and uncontaminated condition Completed |
Evidence:
|
Conduct laboratory testing
|
|
Perform relevant laboratory tests to determine foundation materials properties Completed |
Evidence:
|
Report test results in accordance with enterprise practices Completed |
Evidence:
|
Assign a classification to the site
|
|
Analyse field data, test results and observations, checking for accuracy and validity Completed |
Evidence:
|
Ascertain whether fill is present on-site, its extent, and whether controlled or uncontrolled Completed |
Evidence:
|
Determine the classification of the site in accordance with approved procedures or as documented in the relevant code Completed |
Evidence:
|
Report results to client in accordance with enterprise procedures Completed |
Evidence:
|
Maintain records
|
|
Record and store observations, data and results in accordance with enterprise procedures Completed |
Evidence:
|
Maintain confidentiality and security of client and enterprise information Completed |
Evidence:
|