NTISthis.com

Evidence Guide: MSFSL3004 - Prepare and install architectural engineered leadlight and stained glass

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

MSFSL3004 - Prepare and install architectural engineered leadlight and stained glass

What evidence can you provide to prove your understanding of each of the following citeria?

Identify work requirements

  1. Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with
  2. Work requirements in the form of type of leadlight and stained glass, frames and the method of fixing are identified, confirmed and clarified with appropriate personnel
  3. The process for preparing and installing architecturally engineered leadlight and stained glass is identified
Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements in the form of type of leadlight and stained glass, frames and the method of fixing are identified, confirmed and clarified with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The process for preparing and installing architecturally engineered leadlight and stained glass is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for installation

  1. Work sequence is determined in a logical order to suit the job
  2. Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  3. Components of the leadlight and stained glass are checked against specifications or job order
  4. Leadlight and stained glass fixing method is selected
  5. Frame or opening is prepared to receive leadlight and stained glass
  6. Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate
Work sequence is determined in a logical order to suit the job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components of the leadlight and stained glass are checked against specifications or job order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Leadlight and stained glass fixing method is selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Frame or opening is prepared to receive leadlight and stained glass

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify site conditions and constraints

  1. Site safety hazards are recognised and corrective action taken to reduce risk of injury to self and others
  2. On-site difficulties are identified and addressed in accordance with regulations and enterprise agreements
  3. Special characteristics of the leadlight and stained glass aperture are identified in relation to the effect of the fitting process on the finished job
  4. Covering material is applied, where necessary, to protect existing fixtures and fittings
Site safety hazards are recognised and corrective action taken to reduce risk of injury to self and others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-site difficulties are identified and addressed in accordance with regulations and enterprise agreements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Special characteristics of the leadlight and stained glass aperture are identified in relation to the effect of the fitting process on the finished job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Covering material is applied, where necessary, to protect existing fixtures and fittings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit leadlight and stained glass

  1. Leadlight and stained glass is fixed to the frame or opening using the selected method
  2. Solvents and sealants are applied
  3. Leadlight and stained glass and/or frame are cleaned after fixing
Leadlight and stained glass is fixed to the frame or opening using the selected method

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Solvents and sealants are applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Leadlight and stained glass and/or frame are cleaned after fixing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise the installation

  1. Completed installation is checked to ensure compliance
  2. Waste and scrap material are removed for disposal or recycling, as required
  3. Work area is cleaned and rubbish disposed of, as appropriate
  4. Tools, equipment and unused materials are cleaned, removed and stored appropriately
  5. Workplace records are maintained according to workplace procedures
Completed installation is checked to ensure compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste and scrap material are removed for disposal or recycling, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and rubbish disposed of, as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and unused materials are cleaned, removed and stored appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace records are maintained according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify work requirements

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with

1.2

Work requirements in the form of type of leadlight and stained glass, frames and the method of fixing are identified, confirmed and clarified with appropriate personnel

1.3

The process for preparing and installing architecturally engineered leadlight and stained glass is identified

2

Prepare for installation

2.1

Work sequence is determined in a logical order to suit the job

2.2

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

2.3

Components of the leadlight and stained glass are checked against specifications or job order

2.4

Leadlight and stained glass fixing method is selected

2.5

Frame or opening is prepared to receive leadlight and stained glass

2.6

Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate

3

Identify site conditions and constraints

3.1

Site safety hazards are recognised and corrective action taken to reduce risk of injury to self and others

3.2

On-site difficulties are identified and addressed in accordance with regulations and enterprise agreements

3.3

Special characteristics of the leadlight and stained glass aperture are identified in relation to the effect of the fitting process on the finished job

3.4

Covering material is applied, where necessary, to protect existing fixtures and fittings

4

Fit leadlight and stained glass

4.1

Leadlight and stained glass is fixed to the frame or opening using the selected method

4.2

Solvents and sealants are applied

4.3

Leadlight and stained glass and/or frame are cleaned after fixing

5

Finalise the installation

5.1

Completed installation is checked to ensure compliance

5.2

Waste and scrap material are removed for disposal or recycling, as required

5.3

Work area is cleaned and rubbish disposed of, as appropriate

5.4

Tools, equipment and unused materials are cleaned, removed and stored appropriately

5.5

Workplace records are maintained according to workplace procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify work requirements

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with

1.2

Work requirements in the form of type of leadlight and stained glass, frames and the method of fixing are identified, confirmed and clarified with appropriate personnel

1.3

The process for preparing and installing architecturally engineered leadlight and stained glass is identified

2

Prepare for installation

2.1

Work sequence is determined in a logical order to suit the job

2.2

Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition

2.3

Components of the leadlight and stained glass are checked against specifications or job order

2.4

Leadlight and stained glass fixing method is selected

2.5

Frame or opening is prepared to receive leadlight and stained glass

2.6

Fixing and sealing materials are prepared by mixing or cutting to length, as appropriate

3

Identify site conditions and constraints

3.1

Site safety hazards are recognised and corrective action taken to reduce risk of injury to self and others

3.2

On-site difficulties are identified and addressed in accordance with regulations and enterprise agreements

3.3

Special characteristics of the leadlight and stained glass aperture are identified in relation to the effect of the fitting process on the finished job

3.4

Covering material is applied, where necessary, to protect existing fixtures and fittings

4

Fit leadlight and stained glass

4.1

Leadlight and stained glass is fixed to the frame or opening using the selected method

4.2

Solvents and sealants are applied

4.3

Leadlight and stained glass and/or frame are cleaned after fixing

5

Finalise the installation

5.1

Completed installation is checked to ensure compliance

5.2

Waste and scrap material are removed for disposal or recycling, as required

5.3

Work area is cleaned and rubbish disposed of, as appropriate

5.4

Tools, equipment and unused materials are cleaned, removed and stored appropriately

5.5

Workplace records are maintained according to workplace procedures

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Identify structural leadlight and stained glass, their properties, uses and limitations

Assess the likely impact of various environmental effects on architectural leadlight and stained glass

Prepare and install at least one architecturally engineered leadlight and stained glass component that can be a curtain wall/panel, suspended panel or a balustrade

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for structural leadlight and stained glass

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to the full range of processes for leadlight and stained glass operations

Architectural leadlight and stained glass construction terminology and techniques

Organisational and site standards, requirements, policies and procedures for preparation and installation of architectural leadlight and stained glass

Types of glass and other materials used in the leadlight and stained glass industry, their characteristics, properties, uses and limitations

Environmental protection requirements relating to the disposal of waste material

Established communication channels and protocols

Relevant problem identification and resolution

Storage systems and labelling

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Range Statement

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate some discretion, judgement and problem solving

Appropriate personnel include:

architects

engineers

supervisors

suppliers

clients

colleagues

managers

Architecturally engineered leadlight and stained glass includes:

curtain walls

infill and structural balustrade

suspended and overhead glass

toughened glass assemblies

aluminium systems, including planar assemblies

curtain wall systems

spider assemblies

panel wall systems (hung and stacked)

watertight glazing techniques, including the use of silicone

Tools and equipment include:

assembly benches

drop and up-cut saws

pneumatic, hydraulic and manual presses

lifting equipment

frame tooling

copy routers

end millers

crimpers

electric and pneumatic powered drills and screwdrivers

pop rivet guns

glue guns

general hand tools

Materials include:

leadlight or stained glass panels

annealed glass

safety glass

patterned glass

tinted

heat-reflective

insulated glass units

steel

fasteners

plastics

sealants

tapes

vinyls

gaskets

timber reveals

flashings

Fixing method includes:

consideration of the technical specification, type of glass and frame, security requirements, sealing methods and relevant Australian Standards

Preparation include:

cleaning

surface preparation, if required

checking size against specification

Records include:

the product type

size

inspection

inspection outcomes

quality outcomes

storage locations

Personal protective equipment includes:

that prescribed under legislation, regulation and enterprise policies and practices:

gauntlets

gloves

safety glasses

hard hats

safety footwear

aprons and overalls

Information and procedures include:

workplace procedures relating to the use of tools and equipment and personal protective equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures