The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine job requirements
|
|
Follow standard operating procedures (SOPs) Completed |
Evidence:
|
Comply with work health and safety (WHS) requirements at all times Completed |
Evidence:
|
Identify job requirements from specifications Completed |
Evidence:
|
Determine fabrication shop capabilities and fabricator preferences Completed |
Evidence:
|
Determine shop and field connections from design drawings
|
|
Allocate connections as shop or field-welded in conjunction with fabricator Completed |
Evidence:
|
Allocate connections to be field-bolted and decide the extent of shop preparation of connections Completed |
Evidence:
|
Allocate connection fittings for structural connections to either columns or beams to suit fabrication efficiency or design requirements Completed |
Evidence:
|
Identify required connections
|
|
Identify members requiring connections from design information and identify any potential or specified non-standard connections Completed |
Evidence:
|
Check design information for specification of standard and non-standard connections Completed |
Evidence:
|
Check adequacy of design information for non-standard connections and make request for further information if necessary Completed |
Evidence:
|
Identify standard connections not specified by the designer and specify connection type in conjunction with the fabricator Completed |
Evidence:
|
Obtain approval from designer before detailing and fabrication Completed |
Evidence:
|
Identify and detail connections suitable for standard detailing parameters Completed |
Evidence:
|
Detail connection components using standard detailing parameters Completed |
Evidence:
|
Detail copes and notches for beams and columns Completed |
Evidence:
|
Detail non-standard connections according to supplied design information Completed |
Evidence:
|
Detail purlin and girt cleats
|
|
Identify purlins and girts on design information Completed |
Evidence:
|
Identify cleat length and bolt spacing from purlin or girt manufacturer's instructions or design information Completed |
Evidence:
|
Detail cleats to specifications Completed |
Evidence:
|
Detail haunches for portal frame buildings
|
|
Confirm haunch specifications, bolting information, eave and apex information supplied by designer Completed |
Evidence:
|
Calculate haunch sizes and dimension haunches on shop drawings and erection diagrams Completed |
Evidence:
|
Insert pre-sets for column tops into shop drawings and erection plans where specified in design information Completed |
Evidence:
|
Detail column base plates
|
|
Prepare holding down bolt layout plan according to design information Completed |
Evidence:
|
Specify grouts and shims for column base plates Completed |
Evidence:
|
Specify holding down bolts from design information Completed |
Evidence:
|
Detail steel to non-steel connections
|
|
Determine edge clearances for concrete and other non-steel members or components from designer or non-steel detailer Completed |
Evidence:
|
Identify casting plate types from design information Completed |
Evidence:
|
Identify reinforcement locations and avoid clashes with connections Completed |
Evidence:
|
Avoid interference with post tensioning cables and holding down bolts for upper floor connections Completed |
Evidence:
|
Identify fixings from design information Completed |
Evidence:
|
Detail steel to non-steel connections according to design information Completed |
Evidence:
|