The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Prepare concreting materials.
|
|
Location of steel reinforcement and formwork is determined from drawings and reinforcement schedule. Completed |
Evidence:
|
Reinforcement is checked against reinforcement drawings and specifications. Completed |
Evidence:
|
Formwork components and materials are selected consistent with job. Completed |
Evidence:
|
Fixing and fasteners are selected and used consistent with requirements of the job. Completed |
Evidence:
|
Set out for concrete work.
|
|
String lines are set accurately from existing pegs. Completed |
Evidence:
|
Grades are checked to ensure correct fall. Completed |
Evidence:
|
Services are identified and protected to prevent damage. Completed |
Evidence:
|
Construct and install reinforcement.
|
|
Reinforcing fabric and bars are cut and bent as required to project drawings and specifications. Completed |
Evidence:
|
Fabric and bars are tied or fixed to configuration from project drawings and specifications. Completed |
Evidence:
|
Stiffening rods are attached to panels as required to facilitate handling. Completed |
Evidence:
|
Reinforcement material is located in formwork and placed on bar chairs/spacers as determined from drawings, noting clearance from formwork. Completed |
Evidence:
|
Cast-in items are located and secured. Completed |
Evidence:
|
Erect formwork.
|
|
Work area is cleared and surface prepared for safe erection of formwork. Completed |
Evidence:
|
Formwork is set out to requirements of drawings and specifications. Completed |
Evidence:
|
Formwork is assembled and erected to specifications. Completed |
Evidence:
|
Debris, sawdust and other waste material are safely removed from formwork. Completed |
Evidence:
|
Form release agent is applied to manufacturer specifications. Completed |
Evidence:
|
Carry out concrete work.
|
|
Concrete is transported correctly with wheelbarrow and discharged into formwork, using correct manual handling techniques. Completed |
Evidence:
|
Discharge of concrete from concrete pump line and/or chute into the formwork is controlled correctly. Completed |
Evidence:
|
Concrete is placed correctly to instruction and screeded to specified levels and grades. Completed |
Evidence:
|
Concrete is compacted to specification using immersion vibrator or other specified method. Completed |
Evidence:
|
Concrete is finished and curing process applied to specifications. Completed |
Evidence:
|
Control joints are positioned and installed to specification and to current Australian standard or codes. Completed |
Evidence:
|
Dowel joints are positioned to specification. Completed |
Evidence:
|
Concrete surface is adequately covered and protected. Completed |
Evidence:
|
Strip formwork.
|
|
Edge boxing and braces are removed carefully, safely and sequentially. Completed |
Evidence:
|
Timber components are denailed, cleaned and stored or stacked. Completed |
Evidence:
|
Steel components are cleaned, oiled and stored or stacked. Completed |
Evidence:
|
Damaged formwork components are discarded after stripping. Completed |
Evidence:
|
Screens are safely cleaned before movement, where applicable. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|