UETTDRIS54 Mapping and Delivery Guide
Install and maintain poles, structures and overhead conductors and cables
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | UETTDRIS54 - Install and maintain poles, structures and overhead conductors and cables |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and maintain overhead conductors and cables used on poles and structures (excluding towers). It includes stringing, tensioning and terminating of conductors/cables, cleaning de-energised insulators, securing conductors to insulators or supports and undertaking electrical connections. It also includes maintenance work associated with diagnosing faults, conducting visual inspections, confirming phasing, completing workplace tests, isolating systems and circuits, issuing/accepting electrical access permits and updating system data/maintenance records.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Industry Specific Cross Discipline |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for installation and maintenance of overhead conductors and cables used on poles and/or structures |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of overhead conductors and cables used on poles and/or structures are obtained and confirmed for the purposes of the work to be performed | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures | ||||||||
Element: Relevant work permits are obtained, understood and signed in accordance with workplace procedures | ||||||||
Element: Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Traffic management plan is confirmed as being applied in accordance with workplace procedures | ||||||||
Element: Carry out installation and maintenance of overhead conductors and cables used on poles and/or structures |
| |||||||
Element: Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Electrical systems and circuits are checked and isolated in accordance with job requirements, work permits and workplace procedures | ||||||||
Element: Installation and maintenance of overhead conductors and cables used on poles and/or structures are completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures | ||||||||
Element: Overhead conductor/cables are strung, tensioned and terminated in accordance with workplace procedures | ||||||||
Element: Insulators are cleaned and conductors, anti-vibration devices and spaces/spreaders are secured in accordance with workplace procedures | ||||||||
Element: Electrical connections are made in accordance with job requirements and workplace procedures | ||||||||
Element: Maintenance, including repair and/or replacement of overhead conductors and cables used on poles and/or structures, is carried out in accordance with work schedule, job requirements and workplace procedures | ||||||||
Element: Unplanned events are responded to in accordance with workplace procedures | ||||||||
Element: Quality checks of work are undertaken in accordance with workplace procedures | ||||||||
Element: Complete installation and maintenance of overhead conductors and cables used on poles and/or structures |
| |||||||
Element: WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required | ||||||||
Element: Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Relevant work permits are signed off and overhead conductors and cables used on poles and/or structures are returned to service in accordance with workplace procedures | ||||||||
Element: Conductors/cables are tested and commissioned in accordance with job requirements and workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures |