Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MEM11024 Mapping and Delivery Guide
Undertake basic rigging
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | MEM11024 - Undertake basic rigging |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit of competency defines the skills and knowledge required to undertake basic rigging in a manufacturing or related enterprise and includes rigging work associated with movement of plant and equipment and temporary or permanent steel structures, including: platforms, access ways and ladders, hoppers and bins, and conveyors. This work will often be required to be undertaken with other employees especially tradespersons, bridge and gantry and mobile crane drivers, and doggers.While this unit applies to work covered by licensing requirements, it also includes other manufacturing related skills, including integrating rigging with welding, fabrication, production, jobbing, maintenance or warehouse operations.This unit is not recognised by regulators for licensing requirements. In order to satisfy licensing requirements, the imported unit CPCCLRG3001A Licence to perform rigging basic level will be required.Where interpretation of technical drawings is required unit MEM09002 Interpret technical drawing should also be selected.Where erection, alteration or dismantling of scaffolding is required to be undertaken unit MEM11001 Erect/dismantle scaffolding and equipment and unit MEM11002 Erect/dismantle intermediate scaffolding and equipment, should also be selected as appropriate.This unit does not cover the slinging of loads which is covered in unit MEM11004 Undertake dogging, or the skills associated with fabrication and welding of metal structures or components.Where the selection and use of engineering measurement is required unit MEM12023 Perform engineering measurements should also be selected.Where the selection and use of tools is required unit MEM18001 Use hand tools and unit MEM18002 Use power tools/hand held operations, should also be selected as appropriate.Band AUnit Weight 4 | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Materials handling |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Assess rigging site |
| |||||||
Element: Plan rigging work |
| |||||||
Element: Set up rigging task |
| |||||||
Element: Finalise rigging task |
| |||||||
Element: Determine job requirements |
| |||||||
Element: Comply with work health and safety (WHS) requirements at all times | ||||||||
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs | ||||||||
Element: Identify rigging to be undertaken and assess from supervisor’s instructions and other appropriate sources |
| |||||||
Element: Identify other potential workplace hazards and appropriate hazard control measures | ||||||||
Element: Obtain site information | ||||||||
Element: Identify rigging equipment and associated equipment, including safety equipment available on site |
| |||||||
Element: Identify required safety equipment for rigging task | ||||||||
Element: Consider procedures for minimising disruption to other site processes | ||||||||
Element: Identify appropriate communication methods with appropriate personnel | ||||||||
Element: Select and inspect equipment |
| |||||||
Element: Select required safety equipment and inspect according to SOPs | ||||||||
Element: Isolate all defective rigging equipment, associated equipment and safety equipment and report and record according to SOPs | ||||||||
Element: Select, as applicable, communication equipment and inspect for serviceability |
| |||||||
Element: Inspect ground suitability and check, where appropriate | ||||||||
Element: Review site information and interpret with appropriate personnel | ||||||||
Element: Determine all forces and loads associated with erecting and dismantling structures and associated plant and compare with planned forces and loads in consultation with appropriate personnel | ||||||||
Element: Make required adjustments for actual forces and loads to rigging plan, rigging equipment, associated equipment and safety equipment | ||||||||
Element: Position rigging equipment and associated plant for work application and stability according to SOPs | ||||||||
Element: Apply methods of applying temporary connections using fibre rope according to SOPs and the appropriate standard | ||||||||
Element: Erect, move or dismantle structures, plant or equipment |
| |||||||
Element: Maintain stability of structures, plant or equipment during erection, movement or dismantling | ||||||||
Element: Follow safety procedures where height work is required, including safe and effective use of safety equipment | ||||||||
Element: Use appropriate communication methods and communication equipment to coordinate the rigging tasks | ||||||||
Element: Use associated plant and equipment according to SOPs and the appropriate standard | ||||||||
Element: Connect temporary guys, ties, propping and shoring, including flexible steel wire rope and tubing, as required | ||||||||
Element: Follow procedures to minimise disruption to other site operations | ||||||||
Element: Inspect the completed task according to the appropriate standard |
| |||||||
Element: Remove excess materials from the work area, as applicable | ||||||||
Element: Inspect rigging equipment, associated equipment, safety equipment and associated plant used during rigging task for damage and defects | ||||||||
Element: Isolate all defective rigging equipment, associated equipment, associated plant and safety equipment, report and record according to SOPs | ||||||||
Element: Store rigging equipment and associated equipment according to SOPs and the appropriate standard | ||||||||
Element: Remove hazard prevention/control measures, as appropriate |