Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM10011 Mapping and Delivery Guide
Terminate and connect specialist cables

Version 1.0
Issue Date: July 2024


Qualification -
Unit of Competency MEM10011 - Terminate and connect specialist cables
Description
Employability Skills
Learning Outcomes and Application This unit of competency defines the skills and knowledge required to prepare for the termination and connection of specialist cables that require particular techniques and, in some cases, testing. Most types of these cables are designed to either exclude or minimise the ingress of gas or liquids, or to minimise the danger of flash. Special fittings must be used for each type of specialist cable and cables requiring the use of bending tools and techniques which do not cause damage. All testing is undertaken on completed circuits where these are not connected to main supply, using appropriate methods, including continuity and resistance checks.Where termination and connection of standard electrical wiring/cable is required see unit MEM10002 Terminate and connect electrical wiring.Where the selection and use of engineering measurement is required see unit MEM12023 Perform engineering measurements.Where the selection and use of power tools/hand held operations is required see unit MEM18002 Use power tools/hand held operations.Where termination and connection of signal and data cables is required see unit MEM18063 Terminate signal and data cables.Some jurisdictions may require the holder of this unit to be licensed or certified and users should check with the relevant authorities.Band: AUnit Weight: 3
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Installation and commissioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
       
Element: Comply with work health and safety (WHS) requirements at all times
       
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs
       
Element: Identify job requirements from specifications, drawings, job sheets or work instructions
       
Element: Prepare for termination and connection of specialist cables
  • Ensure all work is undertaken safely to workplace procedures, applicable regulations and legislative requirements
       
Element: Select correct cables and materials in accordance with job requirements
       
Element: Obtain certification documentation, as appropriate
       
Element: Ensure preparation of work is undertaken or checked/inspected for correct locations and specifications
       
Element: Connect specialist cables
  • Ensure terminations/connections are made to specifications, manufacturers' requirements and to safety and state/territory regulations and legislative requirements
       
Element: Ensure all entry points are sealed using appropriate compounds, including resins
       
Element: Install equipment and wiring in a manner that does not reduce the type of protection afforded by the equipment design
       
Element: Test all cabling, connections and terminations for compliance with specifications
       
Element: Ensure all cables, wires, conductors and connections are marked/tagged and labelled to specifications
       
Element: Complete documentation in accordance with relevant specifications and regulatory requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Specialist cables include one (1) or more of the following:

mineral insulate cables (MIMS)

steel wire armoured cables (SWA)

other sheathed cables, including piloted cables

composite screened cables

braided cables

cable installations requiring specialised glands, fittings and enclosures

Tested includes the following:

testing of both continuity and insulation resistance to requirements

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
 
 
 
Ensure all work is undertaken safely to workplace procedures, applicable regulations and legislative requirements 
 
 
 
Ensure terminations/connections are made to specifications, manufacturers' requirements and to safety and state/territory regulations and legislative requirements 
 
 
 
 
 

Forms

Assessment Cover Sheet

MEM10011 - Terminate and connect specialist cables
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM10011 - Terminate and connect specialist cables

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: