The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts. |
Spatial and/or surveying site work may include: | analysis of environment and land cartographic services civil engineering emergency services management geographic information systems (GIS) land ownership tenure system location-based services global positioning mapping determination site analysis survey marks sewerage telecommunications town planning observation utility services observation, such as water water catchment observation. |
Appropriate personnel may include: | colleagues contractors official representatives site visitors staff or employee representatives supervisors or line managers suppliers workplace personnel. |
Loading and unloading plans may include: | assignment instructions, work plans and schedules, policy documents and duty statements information on: nature of load size shape weight. |
Characteristics of the load are identified for operations that include: | carrying lifting lowering down loading and unloading a vehicle setting down a load. |
Applicable regulations and legislation may include: | relevant Australian and international regulations and codes of practice for the handling and transport of dangerous goods and hazardous substances relevant Australian standards and regulations, including state and territory mass and loading regulations relevant Australian state and territory environment protection legislation relevant state, territory and federal OHS legislation. |
OHS may include: | Australian standards identification of potential hazards inspection of equipment and supplies training staff in OHS requirements use of personal protective clothing use of safety equipment and signage. |
Loading and unloading activities may be: | aided by lifting equipment and appliances manual. |
Equipment may include: | camp equipment surveying instruments vehicles. |
Documentation may include: | award, enterprise bargaining agreement, other industrial arrangements codes of practice, including the national standards for manual handling and the industry safety code goods identification numbers and codes, including Australian Dangerous Goods (ADG) markings and HAZCHEM signs load restraint guide manifests, bar codes, goods and container identification manufacturer specifications for equipment and tools quality assurance procedures relevant Australian standards and certification requirements workplace procedures and policies for loading and unloading goods/cargo. |
Personal protective equipment may include: | gloves safety headwear and footwear safety glasses two-way radios high visibility clothing. |
Organisational guidelines may include: | code of ethics company standards legislation relevant to the work or service function manuals OHS policies and procedures personnel practices and guidelines outlining work roles and teamwork responsibilities remote area operations, such as catering and camping requirements. |
Traffic flowand work area conditions may include: | degree of visibility nature of loads obstacles other traffic site surface conditions of work area weather conditions. |
Vehicle may include: | boat car light truck two and four-wheel drive vehicle with or without trailer. |
Workplace procedures may be written or verbal and include: | assignment instructions instructions from colleagues, supervisors and/or managers personal protective equipment requirements reporting and documentation requirements specific client requirements. |