Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCPGS3048A Mapping and Delivery Guide
Install gas pressure control equipment
Version 1.0
Issue Date: July 2024
Qualification | - |
Unit of Competency | CPCPGS3048A - Install gas pressure control equipment |
---|---|---|---|
Description | This unit of competency specifies the outcomes required to install and commission gas control and regulating equipment for consumer gas piping carrying natural gas (NG), liquefied petroleum gas (LPG), or tempered liquefied petroleum gas (TLPG) up to 200kPa.This unit requires the determination of the requirements for gas control and regulating equipment (for pressures up to 200kPa), and its installation, testing and commissioning according to standards.The design requirements of this unit are limited to the application of the design to layout and installation. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | Site location for work application may be a customer's premises. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | CPCPCM2043A Carry out WHS requirements | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Identify requirements for gas pressure control equipment. |
|